Two Decades of Quality Deck Building

Project Build:
Deck Face Lift Plymouth

Location: Plymouth
Build Type: Deck Facelift
Home > Portfolios > Deck Face Lift Plymouth

Before

After

About The Build (Jump to Results)

Project Location: Plymouth

  • Deck facelift – remove the existing decking and railing and install new maintenance-free decking and railing on the existing deck frame and footings.
  • New Azek decking in Autumn Chestnut color is installed, and a custom-built maintenance-free TimberTech composite builder rail in black with a matching Azek Autumn Chestnut deck board on top to create a custom “cocktail rail” style railing that is wide enough to set your drinks on top of. The railing also has black circular aluminum balusters.

Dupont
Decks

DON’T Miss out!

Join our mailing list and be the first to recieve updates, exclusive content, and more!