Two Decades of Quality Deck Building

Project Build:
Facelift in Plymouth

Location: Plymouth
Build Type: Deck Facelift
Home > Portfolios > Facelift in Plymouth

About The Build (Jump to Results)

Job Description:

  • Remove existing decking, railing and stairs completely. Keep the existing deck frame.
  • Remove the angled stair platform with steps and build a new platform in the same spot with the same size.
  • Jack up and support the deck, remove 4”x4” support posts and install new 6”x6’ support posts.
  • Build a new 16’ wide x 6’ long extension on the front edge of the deck.
  • Build new 4’ wide stairs leading down to the ground off of the deck extension.

Decking and Railing

  • Install Deckorators decking in Sierra color.
  • Install Deckorator fascia in Tundra color.
  • Install a custom Westbury drink rail in all black around the perimeter of the deck and on the side of the angled platform on the deck installing a Deckorator Tundra deck board on top.
  • Install standard Westbury railing in all black on the stairs.
  • Install a black Westbury gate at the top of the stairs leading down to the ground.